THROUGHPUT ACCOUNTING AND THE THEORY OF CONSTRAINTS, PART 2

2020-12-13 中華會計網校

It is clear that the heating process is the bottleneck. The organisation will in fact only be able to produce 40,000 units (120,000/3) as things stand.

 

Step 2: Decide how to exploit the system’s bottlenecks

This involves making sure that the bottleneck resource is actively being used as much as possible and is producing as many units as possible. So, 『productivity』 and 『utilisation』 are the key words here. In 『The Goal』, Alex noticed that the NCX 10 was sometimes dormant and immediately changed this by making sure that set ups took place before workers went on breaks, so that the machines were always left running. Similarly, the furnaces were sometimes left idle for extended periods before the completed parts were unloaded and new parts were put in. This was because workers were being called away to work on non-bottleneck machines, rather than being left standing idle while waiting for the furnaces to heat the parts. This was addressed by making sure that there were always workers at the furnaces, even if they had nothing to do for a while.

Step 3: Subordinate everything else to the decisions made in Step 2

The main point here is that the production capacity of the bottleneck resource should determine the production schedule for the organisation as a whole. Remember how, in the previous article, I talked about how new bottlenecks seemed to be appearing at the UniCo plant, because non-bottleneck machines were producing more parts than the bottleneck resources could absorb? Idle time is unavoidable and needs to be accepted if the theory of constraints is to be successfully applied. To push more work into the system than the constraint can deal with results in excess work-in-progress, extended lead times, and the appearance of what looks like new bottlenecks, as the whole system becomes clogged up. By definition, the system does not require the non-bottleneck resources to be used to their full capacity and therefore they must sit idle for some of the time.

Step 4: Elevate the system’s bottlenecks

In The Goal, Alex was initially convinced that there was no way to elevate the capacities of the NCX 10 machine and the furnace without investing in new machinery, which was not an option. Jonah made him and his team think about the fact that, while the NCX 10 alone performed the job of three of the old machines, and was very efficient at doing that job, the old machines had still been capable of producing parts. Admittedly, the old machines were slower but, if used alongside the NCX 10, they

were still capable of elevating production levels. Thus, one of Alex’s staff managed to source some of these old machines from one of UniCo’s sister plants; they were sitting idle there, taking up factory space, so the manager was happy not to charge Alex’s plant for the machines. In this way, one of the system’s bottlenecks was elevated without requiring any capital investment.

This example of elevating a bottleneck without cost is probably unusual. Normally, elevation will require capital expenditure. However, it is important that an organisation does not ignore Step 2 and jumps straight to Step 4, and this is what often happens. There is often untapped production capacity that can be found if you look closely enough. Elevation should only be considered once exploitation has taken place.

 

Step 5: If a new constraint is broken in Step 4, go back to Step 1, but do not let inertia become the system’s new bottleneck

When a bottleneck has been elevated, a new bottleneck will eventually appear. This could be in the form of another machine that can now process less units than the elevated bottleneck. Eventually, however, the ultimate constraint on the system is likely to be market demand. Whatever the new bottleneck is, the message of the theory of constraints is: never get complacent. The system should be one of ongoing improvement because nothing ever stands still for long.

I am now going to have a look at an example of how a business can go about exploiting the system’s bottlenecks – ie using them in a way so as to maximise throughput. In practice, there may be lots of options open to the organisation such as the ones outlined in The Goal. In the context of an exam question, however, you are more likely to be asked to show how a bottleneck can be exploited by maximising throughput via the production of an optimum production plan. This requires an application of the simple principles of key factor analysis, otherwise known as limiting factor analysis or principal budget factor.

 

LIMITING FACTOR ANALYSIS AND THROUGHPUT ACCOUNTING

Once an organisation has identified its bottleneck resource, as demonstrated in Step 1 above, it then has to decide how to get the most out of that resource. Given that most businesses are producing more than one type of product (or supplying more than one type of service), this means that part of the exploitation step involves working out what the optimum production plan is, based on maximising throughput per unit of bottleneck resource.

In key factor analysis, the contribution per unit is first calculated for each product, then a contribution per unit of scarce resource is calculated by working out how much of the scarce resource each unit requires in its production. In a throughput accounting context, a very similar calculation is performed, but this time it is not contribution per unit of scarce resource which is calculated, but throughput return per unit of bottleneck resource.

 

Throughput is calculated as 『selling price less direct material cost.』 This is different from the calculation of 『contribution』, in which both labour costs and variable overheads are also deducted from selling price. It is an important distinction because

the fundamental belief in throughput accounting is that all costs except direct materials costs are largely fixed – therefore, to work on the basis of maximising contribution is flawed because to do so is to take into account costs that cannot be controlled in the short term anyway. One cannot help but agree with this belief really since, in most businesses, it is simply not possible, for example, to hire workers on a daily basis and lay workers off if they are not busy. A workforce has to be employed within the business and available for work if there is work to do. You cannot refuse to pay a worker if he is forced to sit idle by a machine for a while.

 

Page:1 2      See the original article>>

相關焦點

  • 維多利亞2黑暗之心秘籍 指令代碼參數修改教程(4)
    cost = 3600 #研究所耗研究點數   activate_building = fabric_factory   rgo_output = 0.125   farm_rgo_size = -0.05   factory_throughput = 0.1   pop_growth = -0.0008 #添加這個人口增長率
  • Capacity & Throughput:兩種不同的「吞吐量」
    例如: The centre has a weekly throughput of 200 000 shoppers.這家購物中心,每星期有20萬的客流量。
  • 物流與供應鏈詞彙雙解(徵求修訂版): Part 1​
    (2)在項目管理中,它是項目工作的一個要素。它通常有預期的持續時間、預期的成本和預期的資源需求。有時主要的作業比項目更重要。It can refer to raw materials, semi-finished stores, or hold points, or a work backlog that is purposely maintained behind a work center. 2) In the theory of constraints, buffers can be time or material
  • 火鍋季part2丨澳門火鍋,唯有海「鮮」不可辜負
    火鍋季part2火鍋季part2,吃多了川蜀火鍋的辣,咱們今天來口「鮮」的。
  • Pod Topology Spread Constraints介紹
    在上圖中,我們新建一個帶有 "app=foo" label 的 Pod:如果該 Pod 被調度到 zone1,那麼 zone1 中 Node 的 skew 值變為 3,zone2 中 Node 的 skew 值變為 0 (zone1 有 3 個匹配的 Pod,zone2 有 0 個匹配的 Pod );如果該 Pod 被調度到 zone2,那麼 zone1 中 Node 的 skew 值變為 1,zone2
  • 北溪2號可能在2021年開始天然氣輸送
    中國石化新聞網訊 據今日油價網站12月16日消息 俄羅斯能源專家向塔斯社表示,北溪2號天然氣管道可能在2021年底開始向德國輸送第一批天然氣。    上周,這條管道的終點德國海岸的工作恢復,鋪管船Fortuna鋪設了一段2.6公裡(1.6英裡)的管道。
  • [語音]酒店客房物品英文part 3
    part1和part2請直擊[語音]酒店客房物品英文part 1[語音]酒店客房物品英文part 2衣服吸毛的那種)Towel rail  毛巾架Wall paper  牆紙Arm chair  扶手椅Cup  茶杯Mug  口杯Mirror  鏡子Scissors  剪刀▷往期推薦◁[語音]各類蔬菜英文[語音]酒店客房物品英文part
  • 口語訓練:究竟什麼叫a part-time job?
    口語訓練:究竟什麼叫a part-time job?a part time job是什麼意思?見到英語I have a part-time job,我們應該具有「說」英語的能力,而不是僅僅有「說」中文「做兼職」的能力。下面這些高中英語應該是很好的英語口語訓練:1.
  • Graduates take part-time option
    Though the job is part-time, and the money is nothing worth writing home about, the Shanghai resident said it was still better than sitting idle.
  • 初中英語重點詞語辨析:join/join in/take part in
    join, join in, take part in   這三個詞組在漢語中都表示"參加",但在英語使用中是有區別的:   (1)join通常指參加某種固定的組織、團隊、軍隊等,強調成為其中一員。
  • 「part of the furniture」別理解成「家具的一部分」
    大家好,歡迎來的餅哥英語的頻道,今天我們分享一個非常有用且地道的表達——part of the furniture, 這個短語的含義不是指「家具的一部分」,其正確的含義是:part of the furniture 習以為常之事,司空見慣的事
  • 《新編考研英語閱讀理解150篇》Unit One Part A Text 3
    To a culture which has come to take instantaneous communication for granted, as part of the very structure of civilized life, this 「time barrier」 may have a profound psychological impact.